Carbonated Drink Packaging Machine Production Line

King Machine is one of the largest carbonated drink packaging machine production line manufacturers and suppliers in China. We have introduced many professional operators and technicians as well as advanced devices into our factory in order to provide you with precise equipment at competitive...

Product Details

   

Carbonated Drink packaging machine   production line

pruduct description

Products Introduction:

1.The machine is mainly used for filling carbonated drink. It combines rinsing and filling and capping as one automatic body suitable for PET or other plastic bottles. The iso-pressure (iso-barometric) filling technology is adopted enabling it to fill more efficiently and more stably with more output than the machine of the same level from others.

2.Besides using photo-electronic detectors to detect the running of every important sub-process, it employs PLC from OMRON for automatic control of the whole process and new type air-channel for bottle-loading featuring speediness and damage-free of bottle. The handing-over of bottles between two linking structures is fulfilled by applying clamping-bottle-neck method. For bottle of different shape only a few parts need to be changed and the substituting is simple, which shows the machine is of good adaptability.

High automation and easy operation make it an ideal option for beverage companies.

Characteristics:   
1. Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier. 
2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough.. 
3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution. 
4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose. 
5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains. 
6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan's Mitsubishi, France Schneider, OMRON.

Technical parameters

Model

DCGF16-12-6

DCGF18-18-6

DCGF24-24-8

DCGF32-32-8

DCGF40-40-40

DCGF48-48-12

DCGF60-60-15

DCGF80-80-20

Heads of washing, filling, sealing

16-12-6

18-18-6

24-24-8

32-32-8

40-40-10

48-48-12

60-60-15

80-80-20

Production capacity(bottle/hour)

3000-4000

5000-7000

8000-12000

12000-15000

16000-18000

20000-24000

24000-28000

36000-40000

Suitable bottle height(mm)

H=170-320,D=50-100(330-1500ml)

Spraying pressure

0.25-0.3MPa

Total Power(kw)

1.5+0.37

2.2+0.37

3+0.45+0.25

5.5

7.5

11

15

19

Overall dimension(L×W×H)(mm)

2300×1680*2650

2500×1760*2650

3100×2100*2650

3800×2800*2650

4000×3300*3400

4850×3650*3300

6500×5400*3500

7650×6400*2700

Weight(kg)

2600

3500

4650

6800

8500

1000

12500

16000

Main components: (See Drawing 1)

1)  driving system; 

2)  bottle-loading system;

3)  bottle-rinsing system;

4)  handing-over system between rinsing and filling;

5)  filling system;

6)  handing-over system between filling and capping;

7)  capping system;

8)  cap-unscrambling system;

9)  bottle-unloading system;

10)  frame;

11)  electrical system.

Photos:   

Certificates:

图片109.png 

Fair photo:

图片110.png

Workshop:

图片111.png 

Loading: 

图片112.png 

Factory show:

 

Our Services

1.installation, debug

After equipments reached the workshop of customer, place the equipments according to plane layout we offered. We will arrange seasoned technician for equipments installation, debug and test production at the same time make the equipments reach the rated producing capacity of the line. Time for installation and debug is 15-25 days.

2.training

Our company offer technology training to customer. The content of training is structure and maintenance of equipments, control and operation of equipments. Training is in the workshop of customer. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.

3.Quality guarantee

We promise that our goods are all new and not used. They’re made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.

4.After sales

1,After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.

2,After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.

FAQ

Q1: Are you a trading company or a manufactory?

A1: We are a manufactory, we supply the factory price with good quality, welcome to visit !

Q2: What’s your guarantee or the warranty of the quality if we buy your machines?

A2: We offer you high quality machines with 1 year guarantee and supply life-long technical support. 

Q3: When can I get my machine after I paid?

A3: The delivet time is based on the exact machine you confirmed. 

Q4: How can I install my machine when it arrives?

A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.  

Q5: How about the spare parts?

A5: After we deal down all the things , we will offer you a spare parts list for your reference.

Related Products

Inquiry