Automatic 3in 1 Coconut Bottle Water Filling Machine

Automatic 3in 1 Coconut Bottle Water Filling Machine

This CGF Wash-filling-capping 3-in-1unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery.

Product Details

automatic 3in 1 coconut bottle water filling machine
Product Specifications

Product Name

Water filling machine

Item Type

Water filling machine

Place of Origin

Jiangsu, China (Mainland)

Material

SUS 304

Voltage

380V 50 Hz 3phase or customized

Power

4.4~13KW

Dimension

Customized

Weight

According to different model

Capacity

2000-30000bph

After-sales Service Provided

Engineers available to service machinery overseas

Bottle type

circular or square PET or plastic

Bottle valume

0.1-2L

Suitable bottle

Plastic, glass

Application

Water filling

Certification

CE SGS ISO

Warranty

1 year


Product Display:

This CGF Wash-filling-capping 3-in-1unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. Beverage Machinery can finish all the process such as washing bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.
water filling machine.jpg 
Product Detail
The Complete Bottled Mineral Water / Pure Water Production Line used in the beverage filling operations. The three functions of bottle wash, fill and seal are composed in one body of the machine. The whole process is automatic.

Washing partFilling part Capping part 
图片1_副本.png图片2_副本.png图片3.png

Technical parameters

Model

Washing heads

Filling heads

Capping heads

Weight

Overall dimension
     (mm)

CGF14-12-4

14

12

4

3200kg

2500*1880*2300mm

CGF16-16-5

16

16

5

4000kg

2600*1900*2300mm

CGF18-18-6

18

18

6

4500kg

2800*2150*2300mm

CGF24-24-8

24

24

8

6500kg

3100*2450*2300mm

CGF32-32-10

32

32

10

7500kg

3680*2800*2500mm

CGF40-40-12

40

40

12

8500kg

4100*2800*2300 mm

CGF50-50-12

50

50

12

9000kg

4500*3300*2350 mm

You can also customize the size you need

Flow chart of Complete Bottled Mineral Water

1.Bottle production line

PET Resin --Injection moulding machine -Botlte blowing machine --PET bottle
 Water treatment

2.system Raw water--Pump--Silica sand filter--Carbon filter--Water softner--Reverse Osmosis -UV sterilizer-Ozone generator--Finished water tank

3.Filling&Packing part

Bottle unscrambler--Air conveyor--Washing,filling,capping 3in1 machine--Light checker--Blow dryer--Dater printer--Lableing machine --Packing machine -Stock

Flow chart of Complete Bottled Mineral Water.jpg

Product Advantages

1.Using the wind sent access and move wheel in the bottle directly connected technology; canceled screw and conveyor chains, this enable the change the bottle-shaped become easier.
2. Bottles transmission adopt clip bottleneck technology, bottle-shaped transform not need to adjust the equipment level, only change related the curved plate, wheel and nylon parts is enough..
3. The specially designed stainless steel bottle washing machine clip is solid and durable, no touch with the screw location of bottle mouth to avoid secondary pollution.
4. High-speed large gravity flow valve filling valve, filling fast, filling accurate and no liquid lose.
5. Spiraling decline when output bottle, transform bottle shape no need to adjust the height of conveyor chains.
6. Host adopt advanced PLC automatic control technology, the key electrical components from famous company such as Japan\'s Mitsubishi, France Schneider, Siemens. 

Application
The Complete Bottled Mineral Water / Pure Water Production Line is used in filling juices, mineral water and purified water in bottles made of polyester and plastics. The machine can also be used in hot filling if being installed with temperature controlling device.  
Package
Wooden case, export seaworthy package.

Trade Terms

Trade Terms

EXW,FOB,CFR,CIF or others

MOQ

1set

Port

Shanghai port

Shipment

Ocean or air transportation

Payment Terms

L/C,T/T, Western Union, MoneyGram

Payment condition

30%T/T

Supply Capability

20 Set/Sets per Month

Lead Time

About 30 days


Installation, debug

After equipments reached the workshop of customer, place the equipments according to plane layout we offered. We will arrange seasoned technician for equipments installation, debug and test production at the same time make the equipments reach the rated producing capacity of the line. Time for installation and debug is 15-25 days.

Training.jpg





 

Cooperate Clients
7.png

After sale service
1.We send the engineers to help installing, commissioning and training, the engineers start from our factory area.
2.We supply below necessary documents with the machine:
a. Machine layout
b. Electricity diagram
c. Machine certificate
d. General manual book/maintenance book


Related Products

Inquiry